GRID

Physical security closeout Assets · Punch · Photos · Turnover

Close out security projects without the spreadsheet scramble.

HandoffGrid keeps installed assets, punch items, field photos, turnover checklists, and customer-ready handoff packages in one physical security project closeout software workflow while the job is still moving.

One live record per site
Customer-ready PDF exports
Built by a security operator
Start Free Download for Mac — Free See Product Tour → Book 15-Min Walkthrough
Free for low-voltage & security contractors · No credit card required
● Free Mac app
● iPhone app on the App Store
● Start on the web today
20+ Years of owner-side and integrator-side physical security experience behind the workflow
1 System for assets, punch, turnover, and the final handoff package
0 Need to rebuild closeout from spreadsheets, folders, and email threads at the end
Scroll to explore

See closeout move from messy to managed.

A quick pass through the real HandoffGrid workflow: dashboard status, installed assets, punch ownership, and turnover readiness moving in one place.

Dashboard-first project visibility
Asset and punch records tied to the site
Turnover progress ready for the customer package
app.handoffgrid.com / live workspace
HandoffGrid dashboard showing project status and next best actions.
Dashboard See what needs attention before handoff week.
Step 01
HandoffGrid asset register showing installed device records.
Assets Capture serials, locations, photos, and proof.
Step 02
HandoffGrid punch list showing issue ownership and status.
Punch Assign blockers and keep resolution history visible.
Step 03
HandoffGrid turnover checklist showing closeout readiness.
Turnover Package readiness into a cleaner customer handoff.
Step 04

The screens your team actually uses.

Log installed assets, keep punch visible, and move each site toward a handoff package the customer can actually understand.

HandoffGrid asset register with device records and supporting documentation.
Asset Register
Capture the install while the crew still has context.

Serials, models, IPs, locations, and field photos stay tied to the right site record instead of getting cleaned up later.

Installed devices Photo proof Site history
HandoffGrid punch list with owners, due dates, and issue status.
Punch Tracking
Keep blockers visible before handoff week.

Assign deficiencies, track updates, and keep ownership clear so punch does not disappear into email and memory.

Owners assigned Overdue visible Resolution history
HandoffGrid turnover checklist with closeout readiness progress.
Turnover Export
Hand over one organized package.

Turnover status, supporting proof, and final documentation come together in one customer-ready deliverable.

Checklist status Customer-ready PDF Sign-off ready
Desktop App · Free
HandoffGrid for Mac — Free

A free native Mac app with the same HandoffGrid workflow, records, and customer-ready exports. No App Store needed — download straight from us.

Universal (Apple Silicon & Intel) · Requires macOS 14 or later · Signed & notarized by Apple
HandoffGrid desktop workspace with asset register and closeout workflow.
Free download Web-connected workflow Same customer-ready export
iPhone & iPad App
HandoffGrid for iPhone & iPad

One universal app for field teams who need to capture updates, assets, and punch while they are still on site — on iPhone in your pocket or iPad on the cart.

Download on the App Store
Free on the App Store — pairs with your Mac or web workspace.
HandoffGrid iPhone dashboard preview.
HandoffGrid iPhone sites screen preview.
HandoffGrid iPhone assets screen preview.
HandoffGrid iPhone punch list screen preview.
HandoffGrid iPhone turnover screen preview.
Same workspace on iPad
HandoffGrid iPad dashboard showing closeout readiness, next best actions, and blockers across sites.

Built for the people carrying the last mile.

Project Managers
See the next blocker fast.

Know which site needs photos, punch resolution, turnover verification, or customer follow-up before handoff week.

Field Leads
Capture proof while it is fresh.

Keep serials, device locations, install photos, punch notes, and drawings tied to the right site record.

Owners & Facilities
Receive a cleaner package.

Review what was installed, what was resolved, and what is ready for sign-off without chasing scattered files.

Walk a project from install to handoff.

One workflow, four stages, and a clear picture of how sites move from field capture to customer-ready turnover.

Project Manager Story
"I can see exactly what is blocking closeout without chasing spreadsheets, photos, or email threads."
Action bias: unblock sites before handoff week arrives
  • See every site, every blocker, and the next action from one command view.
  • Keep assets, punch, photos, blueprints, and turnover tied to the same site record.
  • Turn closeout into a weekly operating rhythm instead of a last-minute rebuild.
Interactive Product Story
North Tower Refresh
Project manager active
Sites in Motion
08 Crew status visible by site
Assets Logged
142 Serials, models, IPs, and photos
Open Punch
06 Visible before handoff week
Turnover Ready
72% Checklist progress by site
HandoffGrid assets screen showing installed device records and documentation.
Capture Stage
Field proof is attached while the install is fresh.
Teams log assets, upload photos, and tie real install evidence to the correct site record so closeout data does not drift into a separate cleanup project.
Asset register live
Photo proof attached
Blueprint reference linked
Why the PM cares
    Closeout Package
    Ready to assemble
    In Progress
      Missing serial numbers
      Undocumented devices
      Open punch items at handoff
      No field photos uploaded
      Scattered turnover packages
      No site-level visibility
      Manual follow-up loops
      Last-minute surprises

      The deliverable is not another dashboard.
      It's the handoff package.

      HandoffGrid captures the work while the site is still active so closeout does not become a scramble at the end. The result is one clear package showing what was installed, what was resolved, and what is ready for sign-off.

      Customer-ready export
      Cleaner sign-off conversations
      Built for physical security
      What gets captured
      Assets, photos, punch, turnover

      The data that usually lives across phones, spreadsheets, and email threads gets structured by site while the work is happening.

      What the customer sees
      A clear, consistent handoff package

      Instead of a last-minute file hunt, you hand over one organized package that shows what was installed, what was resolved, and what is ready for sign-off.

      Why teams buy
      Fewer callbacks after turnover

      Better records and cleaner punch visibility reduce the "what happened on this site?" loop that drags on after a job should already be closed.

      Why this exists
      Built from real closeout pain

      HandoffGrid comes from 20+ years of owner-side and integrator-side physical security experience focused on the hardest part of the project: the final handoff.

      This is purpose-built for the last mile of physical security project delivery, where messy handoff usually costs time, margin, and trust.
      Sample Closeout Package
      1 Customer-ready export
      What the customer receives
      Closeout Package
      A single handoff package that gives the owner, PM, and integrator the same view of what was installed, what was resolved, what proof was captured, and what is ready for sign-off.
      42 Assets logged
      127 Field photos
      0 Open punch items
      100% Turnover ready
      • Section 01Asset register with serials, models, IPs
      • Section 02Punch log with status and resolution history
      • Section 03Turnover checklist and closeout readiness
      • Section 04Field photo appendix tied to proof of work

      The last mile is where good projects get messy.

      Install gets done. Closeout gets delayed. Serial numbers are missing, field photos live on phones, punch items stay open too long, and turnover packages get assembled at the last minute from scattered files.

      📋
      Missing Asset Records

      Devices are installed, but the final record is incomplete when the customer asks what was actually deployed.

      📸
      Field Proof Trapped on Phones

      Required installation photos and supporting documentation are hard to find when sign-off gets close.

      🔴
      Open Punch at Handoff

      Deficiencies stay unresolved because ownership, status, and follow-up are not visible enough.

      📁
      Scattered Turnover Documents

      The final package gets rebuilt from folders, email threads, and memory instead of coming together as the work happens.

      Built for the messy part of the project.

      The platform is focused on the last mile: documenting what was installed, clearing what is still open, and handing over a package that feels organized instead of improvised.

      01 / ASSET TRACKING
      🏷️
      Log Installed Assets

      Track every installed device by site with serial numbers, model numbers, IP addresses, locations, and install status before closeout becomes a file hunt.

      02 / DOCUMENTATION
      📷
      Capture Field Proof

      Attach installation photos directly to assets and punch items from the field so proof of work stays tied to the actual device or deficiency.

      03 / PUNCH LISTS
      ✅
      Track Punch to Resolution

      Log deficiencies, assign owners, set priorities, and keep unresolved work from disappearing into email threads and spreadsheets.

      04 / NOTIFICATIONS
      📬
      Email Notifications

      Assignees get notified when a punch item lands in their queue, and overdue reminders keep the team accountable without manual follow-up.

      05 / TURNOVER
      📦
      Complete Turnover Readiness

      Work through a structured checklist per site so everyone can see what is still missing before customer handoff.

      06 / VISIBILITY
      📊
      Know What Is Blocking Closeout

      Critical alerts, overdue items, missing documentation, per-site readiness, and next actions stay visible in one command view.

      What changes when closeout runs in one system.

      Most teams try to clean everything up at the end. HandoffGrid changes that rhythm by capturing the proof while the work is still moving.

      Before
      Closeout gets rebuilt at the end.
      Teams spend the last stretch of the project chasing proof instead of finishing the work with confidence.
      • Serials, photos, and notes live across phones, folders, and spreadsheets.
      • Punch ownership gets fuzzy and follow-up turns into email cleanup.
      • The customer package is assembled under deadline pressure.
      After
      The package builds itself as the site moves.
      Documentation, punch, and turnover readiness stay visible while the job is still active, so handoff feels controlled instead of improvised.
      • Asset records, field proof, and drawings stay tied to the same site record.
      • Teams can see what is still blocking handoff before the final week.
      • The customer sees one cleaner, more trustworthy deliverable.
      Result
      Fewer surprises. Better signoff.
      HandoffGrid is less about adding another dashboard and more about reducing the chaos that usually shows up at the finish line.
      • Cleaner turnover meetings
      • Better audit trail for what was installed and resolved
      • Less time lost rebuilding closeout from scattered files
      🏗️
      Founder-Led
      Built by a physical security operator with 20+ years on the owner and integrator side
      🎯
      Purpose-Built
      Focused on physical security closeout instead of generic project management
      🔒
      Secure & Cloud-Synced
      Role-based access, customer-scoped records, and cloud-backed field data

      Sentinel VMS: the cameras you install, on hardware you own.

      HandoffGrid tracks the install. Sentinel runs the cameras after handoff: a free, open-source video management system that records IP cameras on the customer's own Mac or Linux server, with no cloud subscription and no per-camera fees.

      Record
      Native H.264 / H.265.

      ONVIF auto-discovery, continuous and motion recording, and a timeline with precise clip export.

      Detect
      On-device AI.

      Person and vehicle detection runs locally. Footage stays on the customer's network.

      Watch
      Free iPhone app.

      Live view, playback, and alerts from anywhere with Sentinel Mobile on the App Store.

      Start with one site.
      Make the handoff cleaner.

      You do not need a big rollout to feel the difference. Start on one active project, capture the proof as the work happens, and hand over a better package at the end.

      ✓ Start free on one site
      ✓ Upgrade when you want unlimited sites and exports
      ✓ Keep your PMs, field team, and owner view aligned
      Live Workflow
      1 Shared closeout system
      Run the final mile without the scramble.

      One place for assets, punch, turnover, and the final package means fewer loose ends when the customer is ready for signoff.

      Capture Log the work while the field still has the context.
      Resolve Keep punch, ownership, and proof visible to the team.
      Deliver Hand over one package that feels organized and complete.
      Start Free →
      Free forever on 1 site. No credit card required. Upgrade anytime.
      Web
      Start Today
      The fastest path for new teams. Start on the live web app right away.
      Open Web App
      Mac
      Free Download
      A free native Mac app, downloaded directly from HandoffGrid. Signed & notarized by Apple.
      Download for Mac — Free
      iPhone
      Free Download
      A field-first iPhone app for site updates, assets, and punch — free on the App Store.
      Download on the App Store

      Questions?
      Let’s talk.

      Have questions about HandoffGrid, pricing, or whether it fits your team? Reach out directly or send a message below and I’ll get back to you.

      General
      hello@handoffgrid.com
      For general questions, product fit, and rollout planning conversations.
      Support
      support@handoffgrid.com
      For app issues, workflow questions, or platform-related help.
      Prefer email? Use the addresses above anytime.
      Send a message
      Talk to a human.

      This form sends directly to HandoffGrid so you can get a real reply without bouncing through your mail app.

      Direct founder contact. No generic inbox maze.